Back to Field Notes
Tech & ProductsNov 10, 2026

A shift-handover record for vacuum pressure casting

A shift-handover record for vacuum pressure casting

Trace each jewelry casting batch from the incoming alloy to inspected parts. Give the next shift a consistent way to distinguish a process change from a machine alarm.

In this article

Trace each jewelry casting batch from the incoming alloy to inspected parts. Give the next shift a consistent way to distinguish a process change from a machine alarm.

Make one row per flask or run

Record the batch ID, alloy lot, part and tree revisions, flask size, mould preparation, actual transfer time and machine recipe. Link the machine program or log where available. For a CYLANCO CXM-C18 or CXM-C20 line, record the model and the configuration used. If a setting is changed after an interruption, preserve the original record and log who changed it and why.

Record rejects by location and defect

Mark the tree position, part feature and defect type. Separate incomplete fill, visible surface marks and suspected internal defects. Note how the defect was confirmed. A photograph with a batch reference is more useful for comparison than an unlabelled photograph of a reject. Calculate first-pass acceptance against the parts inspected and keep rework separate.

Agree what the next shift should repeat

Flag the last accepted batch and any run still under review. Hand over the approved recipe, the material and mould version, and any open inspection. If a problem repeats, change one controlled variable in an agreed trial where practical and preserve comparison samples. Record the outcome before promoting a revised process to production.