CXM-AI-N2 Economy Melting Furnace
Cost-efficient configuration for entry-level production

System data sheet.
- Voltage
- Three-phase 380V
- Power
- 7kW
- Metal capacity
- 1-2kg
- Applicable metal
- Gold, silver, copper
- Melting time
- 1-3 m/t
- Machine size
- 450x450x820mm
- Optional configuration
- 3P water cooler
- Highlighted customization
- 1-100KG capacity customizable for melting and granulation series
What this system is.
The CXM-AI-N2 Economy Melting Furnace provides a cost-effective induction melting solution for small and medium workshops. It focuses on practical performance, simple operation, and reliable daily throughput for gold and silver melting tasks.
Where it fits.
Typical scenarios this system is built to serve. Your specific line may overlap more than one.
- 18K / 14K Gold
Boutique and mid-volume gold casting where color uniformity and porosity rate are the bottleneck.
- Sterling Silver
Silver jewelry runs where oxidation control and clean pour geometry define the finishing workload downstream.
- Filigree & Fine Detail
Thin-wall pieces where the fill pressure, grain refinement, and surface fidelity have to be dialed in together.
- Rapid Recipe Switching
Lines running multiple alloys or SKU variants in the same day. Stored programs keep handoff-to-cast stable.
Defects this system addresses.
How the architecture of the machine maps onto the failure modes most common in jewelry casting production.
- Porosity & gas inclusions
Vacuum chamber evacuation before pour, with pressure-assisted fill and secondary vibration to collapse micro-voids before the front solidifies.
- Cold-shut & incomplete fill
Positive pressure during fill keeps the front moving through thin walls; recipe-locked thermal profile prevents the temperature drop that causes shorts.
- Color unevenness & segregation
In-chamber melting eliminates the melt-to-cast handoff step where most segregation and oxidation is introduced. One chamber, one thermal envelope.
- Batch-to-batch inconsistency
Stored programs lock the full sequence — temperature ramp, pressure window, vibration timing — so operator judgement isn't re-introduced each run.
- Operator-dependent quality
Digital recipe control removes the places where tacit know-how gets lost on a shift change. The workflow holds, even when the person changes.
Lead time, install, warranty.
- Lead Time
- 4–6 weeks from confirmed order and configuration lock.
- Packaging
- Export-grade wooden crate, rust-prevention wrap, shock-monitor seal on critical SKUs.
- Installation
- On-site commissioning by a Cylanco engineer available in most regions. Remote supervised install for straightforward configurations.
- Training
- Two-day operator + maintenance training — on-site or hybrid — included with flagship systems.
- Warranty
- 12 months on parts and labor. Lifetime technical support for recipe tuning and workflow questions.
- Spares
- Common wear parts kept in stock; airfreight available. Consumables quoted with the initial configuration.
Options & modules.
- Cost-efficient configuration for entry-level production
- Reliable induction melting for routine workshop use
- Compact footprint and straightforward maintenance
- Stable operation for small-batch casting preparation
- Optional water-chiller support
Configure this system for your line.
Share alloy, throughput target, and facility context. We map the right configuration — not a generic machine list — and reply within 24 hours.